Question 1

A 1,500 ft2 (139 m2) mobile home is built in the downtown area of a major city. 90% of the project's gross floor will be

completed by the time of occupancy. LEED certification is being sought. Which rating system would be the most

appropriate one to use?


Correct : C

The most appropriate LEED rating system for a mobile home is LEED for Homes. This rating system is designed for residential projects and is suitable for a mobile home located in a downtown area of a major city. Since the project is a home and not a commercial or public building, the LEED for Homes rating system would provide the best fit for certification.


Options Selected by Other Users:
Mark Question:

Start a Discussions

Submit Your Answer:
0 / 1500
Question 2

Which of the following should a project team take into consideration during the discovery phase of site selection to earn Integrative Process Credit?


Correct : D

During the discovery phase of site selection for the Integrative Process Credit, the project team should consider factors that affect the well-being of occupants, the attributes of the building site, transportation options, and features of the building.This holistic approach ensures that the project aligns with the integrative process goals of enhancing human health and environmental performance1.


LEED v4 for Interior Design and Construction Reference Guide2.

Understanding Integrative Design in LEEDv41.

Options Selected by Other Users:
Mark Question:

Start a Discussions

Submit Your Answer:
0 / 1500
Question 3

Which of the following is required for a cooling tower and evaporative condenser in the Water Efficiency Prerequisite, Indoor Water Use Reduction?


Correct : B

For the Water Efficiency Prerequisite, Indoor Water Use Reduction, cooling towers and evaporative condensers must have makeup water meters to measure the amount of water used, conductivity controllers to optimize water quality and minimize consumption, and overflow alarms to prevent excess water use.


Options Selected by Other Users:
Mark Question:

Start a Discussions

Submit Your Answer:
0 / 1500
Question 4

Design is underway for a new tenant suite with 4,000 ft2 (371.6 m2) of net occupiable are

a. The project build-out will include all new HVAC systems. Operable windows are installed as follows:

* A total 75 ft2 (7.0 m2) located within 15 ft. (4.6 m) of all spaces

. A total 50 ft2 (4.6 m2) located within 25 ft. (7.6 m) of all spaces

Which design and documentation strategies must be used to demonstrate compliance with Indoor Environmental Quality Prerequisite, Minimum Indoor Air Quality Performance?


Correct : C

To comply with the Indoor Environmental Quality Prerequisite, Minimum Indoor Air Quality Performance, the design must include mechanical outside air systems that meet the requirements of ASHRAE 62.1-2010. This standard specifies the minimum ventilation rates necessary to maintain indoor air quality. The project must document compliance by showing that the mechanical systems provide the appropriate amount of outdoor air to the occupied spaces.


Options Selected by Other Users:
Mark Question:

Start a Discussions

Submit Your Answer:
0 / 1500
Question 5

A single tenant occupies an entire building but wishes to renovate and achieve LEED certification on only a portion of the building. This is possible if


Correct : B

For a single tenant who occupies an entire building and wishes to achieve LEED certification for only a portion of the building, it is essential that the project boundary encompasses the entire construction scope. This means that all areas undergoing renovation must be included within the project boundary, and this boundary must be delineated by a clear, physical barrier.


Options Selected by Other Users:
Mark Question:

Start a Discussions

Submit Your Answer:
0 / 1500
Page:    1 / 20   
Total 100 questions