Curious about Actual US Green Building Council LEED Certifications (LEED-AP-BD+C) Exam Questions?
Here are sample US Green Building Council LEED AP Building Design + Construction (LEED-AP-BD+C) Exam questions from real exam. You can get more US Green Building Council LEED Certifications (LEED-AP-BD+C) Exam premium practice questions at TestInsights.
A school project is located in a basin. Snow melts in the spring on the nearby mountains which replenishes the local water supply. The nearby highways are sometimes closed during the winter due to the winter storm. What is the top priority the project team should focus on?
Correct : B
This option requires the project team to focus on reducing the water consumption of the school project, because it is located in a basin that depends on the seasonal snowmelt for its water supply1. Installing efficient plumbing fixtures, such as low-flow faucets, toilets, and showerheads, can help save water and reduce the demand on the local water resources2. This option can also help the project achieve the LEED credits for outdoor and indoor water use reduction3.
Start a Discussions
Under the Building Design and Construction rating systems, projects can opt for a review process that helps teams determine if the project is on track to achieve LEED certification at its preferred level. This process is referred to as
Correct : A
A split review is an optional review process that allows project teams to submit the design and construction portions of their projects separately. This can help teams determine if the project is on track to achieve LEED certification at its preferred level, and identify any issues or clarifications needed before the final review. A split review also reduces the documentation burden and review time for the construction review12.
Start a Discussions
Which views would qualify as a quality view for Indoor Environmental Quality Credit, Quality Views?
Correct : C
Quality views are defined in LEED as those which consist of multiple elements of nature, weather, or movement that allow for a connection beyond the interior space. Views that allow a clear line of sight to the exterior via vision glazing, with a view factor of 3 or greater, qualify for this credit. Fixed glazing in common spaces can also contribute to this credit.
Start a Discussions
What requirement must be met when creating a Demand Response Program that satisfies Energy and Atmosphere Credit, Demand Response?
Correct : D
To achieve the Energy and Atmosphere (EA) Credit: Demand Response, a project must create a comprehensive plan for responding to a demand response event (D). This includes a strategy for reducing electrical load when a demand response event is triggered by the utility provider. The plan should outline actions for shifting or reducing energy use during peak demand times to support grid stability. Permanent reductions (A), submetering (B), and specific load shift reductions (C) are not required for this credit.
Start a Discussions
To assess the feasibility of earning Location and Transportation Credit, Reduced Parking Footprint, the project team should be familiar with what local government regulation?
Correct : D
To evaluate the Location and Transportation (LT) Credit: Reduced Parking Footprint, the project team should be aware of the minimum number of parking spaces required by the zoning code (D). This credit aims to reduce the environmental impact of parking by minimizing the number of spaces provided, encouraging alternative transportation methods. Knowledge of local parking minimums helps the team ensure compliance with LEED while avoiding excess parking, which can contribute to urban sprawl and the heat island effect. Design guidelines and building code standards are not directly relevant to this credit.
Start a Discussions
Total 270 questions