Question 1

Which of the following measurements indicates there may be bias In the forecast model?


Correct : C

The tracking signal is a measurement that indicates there may be bias in the forecast model. The tracking signal is the ratio of the cumulative forecast error to the mean absolute deviation (MAD). It measures how well the forecast is tracking the actual demand over time. A tracking signal of zero means that the forecast is perfectly accurate. A tracking signal within the range of -4 to +4 is considered acceptable. A tracking signal outside this range indicates that the forecast is consistently overestimating or underestimating the demand, which implies that there is bias in the forecast model. Bias is the tendency of a forecast to be consistently higher or lower than the actual demand. Bias can be caused by factors such as inaccurate data, inappropriate forecasting methods, or changes in demand patterns.Reference:

Managing Supply Chain Operations, Chapter 5: Demand Management and Forecasting, Section 5.2: Forecasting Methods, Subsection 5.2.3: Forecast Accuracy and Control

CPIM Exam Content Manual, Module 3: Demand, Section 3.2: Forecasting, Subsection 3.2.2: Forecasting Methods, Subsubsection 3.2.2.3: Forecast Accuracy and Control


Options Selected by Other Users:
Mark Question:

Start a Discussions

Submit Your Answer:
0 / 1500
Question 2

Which of the following stock location systems would you use in a repetitive manufacturing, lean environment?


Correct : C

Point-of-use storage is a stock location system that places inventory close to where it is needed or consumed in the production process. This reduces waste, handling, and transportation costs, and improves material flow and visibility. Point-of-use storage is a key element of a lean environment, where inventory is minimized and replenished frequently based on demand signals.Reference:EXAM CONTENT MANUAL PREVIEW, page 15, section 7.1.2.Manufacturing Planning and Control for Supply Chain Management: The CPIM Reference, Second Edition, page 462, section 13.3.


Options Selected by Other Users:
Mark Question:

Start a Discussions

Submit Your Answer:
0 / 1500
Question 3

An effective approach to projecting requirements for materials with long lead times Includes which of the following options?


Correct : A

An effective approach to projecting requirements for materials with long lead times is to initiate a multilevel master schedule. A multilevel master schedule is a detailed plan that shows the quantities and timing of the end items and all of their components at each level of the bill of materials (BOM). By using a multilevel master schedule, a planner can determine the requirements for materials with long lead times and place orders in advance to avoid shortages or delays. A phantom bill of materials (BOM) is a temporary grouping of components that are used in the production of a parent item, but do not exist as a separate item in inventory. A phantom BOM is not an effective approach to projecting requirements for materials with long lead times, as it does not reflect the actual demand for the components. Increasing the level of safety stock is a way of mitigating the risk of uncertainty in demand or supply, but it is not an effective approach to projecting requirements for materials with long lead times, as it increases the inventory carrying costs and does not address the root cause of the problem. Decreasing the planning horizon is the opposite of an effective approach to projecting requirements for materials with long lead times, as it reduces the visibility and accuracy of the forecast and increases the likelihood of stockouts or excess inventory.Reference:

CPIM Part 2 Learning System, Module 1: Supply Chain Strategy, Section 1.4: Master Scheduling

CPIM Part 2 Learning System, Module 3: Supply, Section 3.2: Material Requirements Planning


Options Selected by Other Users:
Mark Question:

Start a Discussions

Submit Your Answer:
0 / 1500
Question 4

In preparing for a facility location decision, proximity to suppliers would be classified as which kind of criteria?


Correct : D

Proximity to suppliers would be classified as a cost factor in preparing for a facility location decision. Cost factors are the expenses associated with operating a facility in a specific location, such as labor, materials, utilities, taxes, and transportation. Proximity to suppliers can affect the cost of inbound transportation, inventory holding, and quality control. Choosing a location that is close to suppliers can reduce these costs and improve the efficiency and reliability of the supply chain.Reference:

Managing Supply Chain Operations, Chapter 2: Global Supply Chain Strategy, Section 2.3: Facility Location

CPIM Exam Content Manual, Module 1: Supply Chains and Strategy, Section 1.4: Facility Location, Subsection 1.4.1: Facility Location Concepts


Options Selected by Other Users:
Mark Question:

Start a Discussions

Submit Your Answer:
0 / 1500
Question 5

A company assembles kits of hand tools after receipt of the order from distributors and uses two-level master scheduling. The appropriate levels of detail for the forecasts that are input to master scheduling would be total number of kits and:


Correct : D

A company that uses two-level master scheduling has a master production schedule (MPS) for the end items (kits) and a final assembly schedule (FAS) for the components (tools). The forecasts that are input to master scheduling should reflect the total number of kits and the specific kit configurations, as these determine the demand for the components. The other options are not relevant for master scheduling, as they do not reflect the end item demand or the bill of materials structure.Reference:EXAM CONTENT MANUAL PREVIEW, page 10, section 4.1.2.Manufacturing Planning and Control for Supply Chain Management: The CPIM Reference, Second Edition, page 163, section 6.2.


Options Selected by Other Users:
Mark Question:

Start a Discussions

Submit Your Answer:
0 / 1500